
Muhammad Yaseen
Project Planning, Forensic Delay Analyst and FIDIC Claims Engineer
Kompetenzen

Meine Dienstleistungen


Arbeitserfahrung
Assistant Director (Engineer)
PICIIP • Vollzeit
Aug 2025 - Present • 1 yr 1 mo
> Managing project planning, monitoring, and Contract administration of ADB funded multi-sector infrastructure works across Sahiwal, Sialkot, Lahore & Lalamusa, including water supply, sewerage, roads, flyover, disposal stations, buildings and wastewater treatment facilities. > Evaluated PKR 1,039M (~$3.65M) prolongation and idle cost claims by enforcing reliance on the approved Program of Works and identifying methodological gaps in the Contractor’s submission, resulting in an 75% reduction to PKR 255M (~$0.89M), with the Employer’s principal position upheld at Adjudication stage, earning formal recognition from the Chief Engineer. > Assisted in evaluation and challenging of Contractor’s claim, in Adjudication and Arbitration, interpreting contract provisions and discrepancies therein and substantiating Employer’s counter-positions, and succeeded in reducing the Contractor’s Claim from PKR 496M to PKR 361M. > Applied advanced delay analysis methodologies including Impacted As-Planned, As-Planned vs As-Built, and Collapsed As-Built to analyze Contractor’s EOT Claims. > Developed baseline and recovery schedules using Primavera P6, aligning execution with contractual milestones and improving schedule reliability. > Administering FIDIC-based contracts, handling Variation Orders (VOs), Interim Payment Certificates (IPCs), price adjustments, and the Engineer’s determinations. > Prepared technical reports and official correspondence for stakeholders. > Assisted in preparation and submission of Departmental Replies to Audit by Accounts General, Punjab. > Enforced OSHA-compliant HSE protocols, particularly during deep trench operations, and ensured site safety and regulatory adherence.
Planning & Schedule Engineer
Jers Consultancy • Vollzeit
Oct 2023 - Aug 2025 • 1 yr 10 mos
> Delivered planning and project control functions on Asian Development Bank (ADB) funded infrastructure projects across Sahiwal, Sialkot, and Lalamusa, including Construction of Grade Separator (Flyover) (~1 KM Length), Shahabpura – Sialkot; Roads Upgradation (~6.1 KM Length) including ITS System & Control Room –Sahiwal; Upgradation of Punjab Local Government Academy (PLGA), Lalamusa including Architectural Works with installation of IT, Electrical & Allied Items. > Developed and maintained baseline schedules aligned with approved Programs of Works. > Monitored physical and financial progress using Primavera P6, applying Earned Value Management (EVM) metrics including CPI, SPI, SV and BV, and developed Power BI dashboards to enhance transparency and decision-making at project and program levels. > Evaluated Contractors’ Extension of Time (EOT) claims through forensic schedule analysis using Primavera P6 and prepared corresponding evaluation reports. > Evaluated Contractor’s Idle Machinery & Prolongation Claims and assisted the Project Manager in determination of the Claims, and continued through Adjudication. > Worked directly with the Project Manager, contributing in Contract Administration through reviewing & processing Interim Payment Certificates (IPCs), Price Adjustment Payments, Variation Orders (VOs) of the Contractors. > Applied Time Impact Analysis (TIA), baseline comparison and EVM analyses on Primavera P6, to assess delays on PLGA Lalamusa project, establishing Contractor-attributable delays; supported Project Manager’s Determination to reject EOT claim and enforce Liquidated Damages. > Coordinated closely with supervision teams to consolidate monthly and quarterly progress reports across multiple work fronts. > Assisted project leadership in design development, construction supervision, and overall projects administration and management. > Coordination in the feasibility studies of Land Fill Sites and Urban Mobility Plans – Sahiwal & Sialkot, DEDs.
Civil Engineer
SAMPAK International • Vollzeit
Dec 2021 - Oct 2023 • 1 yr 10 mos
> Project Coordination of PHA-F 43 Nos. Multistorey Building Apartments (G+6 & G+7), Shopping Mall, Roads and Water Supply Works, I 16/3, Islamabad; Infrastructure Development Works including roads and water supply & sewerage components, State Life Co-operative Housing Society, Lahore and other projects. > Developed and maintained project schedules aligned with approved Programs of Works.• Monitored physical and financial progress using Primavera P6 and EVM metrics, reporting via Power BI dashboards. > Coordinated with the site supervision teams in preparation of Monthly & Quarterly Progress Reports of the Projects. > Evaluated EOT claims using Primavera P6 and Microsoft Project. > Worked directly with the Engineer and assisted in reviewing & processing of Interim Payment Certificates (IPCs), Price Adjustment Payments, Variation Orders (VOs) of the Contractors. > Supported in structural analysis and design using ETABS and preparation of drawings. > Assisted in Preparation of Bidding Documents, and further Evaluation of Bids for award of several projects. > Prepared Engineer’s Estimate for several projects. > Due to change in design of Shopping Mall, I-16/3, from G+1 to G+2, performed Structural Analysis on ETABS software and accordingly assisted in the revision of drawings.