
Shivam Tanwar
BIM Modeler
Kompetenzen

Meine Dienstleistungen


Portfolio
Arbeitserfahrung
BIM Engineer (MEPF)
Creative Labs Pte Ltd
May 2026 - Present • 5 mos
1. Developed and coordinated MEPF BIM models in Autodesk Revit for multidisciplinary building projects. 2. Modelled Mechanical, Electrical, Plumbing, and Fire Protection systems based on design drawings, specifications, and project requirements. 3. Perform multidisciplinary BIM coordination with Architectural and Structural models to ensure proper system routing and spatial coordination. 4. Conduct clash detection in Navisworks and Revit, identify, review, and coordinate clashes with relevant disciplines for timely resolution. 5. Model and coordinate complex MEPF services in critical hospital areas, including corridors, patient rooms, operating areas, plant rooms, and service spaces. 6. Review design drawings and project requirements to develop accurate and coordinated MEPF models while maintaining design intent. 7. Resolve modelling and coordination issues by modifying system layouts, elevations, and service routes based on coordination requirements. 8. Generate and export DWG and PDF drawings using DiRoots ProSheets, ensuring accurate and organized project deliverables. 9. Participate in coordination discussions and communicate clashes, constructability issues, and required design modifications to the project team. 10. Maintain BIM model quality and consistency in accordance with project-specific BIM standards and client requirements.
BIM Modeler
Tatva Engineering • Vollzeit
Feb 2024 - May 2026 • 2 yrs 3 mos
1. Developed and updated HVAC layouts in Autodesk Revit based on design markups and requirements provided by Australian engineers 2. Worked on Australian MEP/HVAC projects using BIM (Building Information Modeling) tools to create and coordinate 3D HVAC models. 3. Reviewed and interpreted design markups in Bluebeam and implemented required revisions accurately in Revit models and drawings. 4. Coordinated directly with Australian engineering teams to clarify design requirements, resolve drawing/modeling issues, and incorporate project feedback. 5. Prepared HVAC documentation, including plans, sections, equipment layouts, schedules, and drawing sheets, in accordance with project requirements. 6. Used CAMEL software as part of the HVAC design/drafting workflow and supported the preparation and development of project layouts. 7. Revised HVAC models and drawings throughout different project stages based on client comments, design changes, and coordination requirements. 8. Supported BIM coordination by identifying and resolving conflicts between HVAC elements and other building services and disciplines.