s
shehzadali8965

Shahzad

@shehzadali8965
5,0(46)

Level 1

Flooring cost and quantity estimation expert for bidders

Pakistan
Englisch, Urdu
Einige Informationen werden in englischer Sprache angezeigt.
Über mich
Experienced Flooring Estimator | Division 6, Division 9, and Division 12 Specialist As a dedicated commercial and residential flooring estimator, I bring a wealth of expertise in Division 9 (Finishes), Division 6 (Wood, Plastics, and Composites), and Division 12 (Furnishings Resilient Sheet LVT/Plank VCT Ceramic Flooring and Walls Stone & Tops Resilient Base Ceramic Base Integral Base Schluter Trims Eliminate the unnecessary assumption from your work and ensure the precise and accurate Estimates. No wait for the Next Let's Start Today. Your Satisfaction will be on 1st among priorities. ... Mehr lesen
s
shehzadali8965
Shahzad
offline • 
Durchschnittliche Antwortzeit: 1 Stunde

Meine Dienstleistungen

Materialermittlung und Kostenschätzung
I will be commercial and residential flooring estimator for bidders
5,0(46)
Materialermittlung und Kostenschätzung
I will do flooring and ceramic quantity takeoff and cost estimation

Portfolio

46 Bewertungen
5,0

(45)
(1)
(0)
(0)
(0)
Zusammensetzung der Bewertung
  • Kommunikation
    5
  • Qualität der Lieferung
    5
  • Preis-Leistungs-Verhältnis der Lieferung
    5
1–5 von 46 Bewertungen
Sortieren nach:
Am relevantesten
    C

    clevpittsfred

    Wiederkehrender Kunde

    US

    Vereinigte Staaten

    5

    this was a very large project with many details along with a short timeline to complete the estimate. it was done on time and extremely accurate. will continue to use for future work

    200 $-400 $

    Preis

    9 Tagen

    Dauer

    gig

    Materialermittlung und Kostenschätzung

    Hilfreich?
    Ja
    Nein
    C

    clevpittsfred

    Wiederkehrender Kunde

    US

    Vereinigte Staaten

    5

    timely and accurate

    50 $-100 $

    Preis

    4 Tagen

    Dauer

    gig

    Materialermittlung und Kostenschätzung

    Hilfreich?
    Ja
    Nein
    C

    clevpittsfred

    Wiederkehrender Kunde

    US

    Vereinigte Staaten

    5

    on time and accurate as always

    50 $-100 $

    Preis

    4 Tagen

    Dauer

    gig

    Materialermittlung und Kostenschätzung

    Hilfreich?
    Ja
    Nein
    C

    clevpittsfred

    Wiederkehrender Kunde

    US

    Vereinigte Staaten

    5

    on time and accurate

    50 $-100 $

    Preis

    4 Tagen

    Dauer

    gig

    Materialermittlung und Kostenschätzung

    Hilfreich?
    Ja
    Nein
    C

    clevpittsfred

    Wiederkehrender Kunde

    US

    Vereinigte Staaten

    5

    thorough and on time

    50 $-100 $

    Preis

    4 Tagen

    Dauer

    gig

    Materialermittlung und Kostenschätzung

    Hilfreich?
    Ja
    Nein