s
shahroztahir

Shahroz Tahir

@shahroztahir
5,0(1)
Pakistan
Hindi, Punjabi, Englisch, Urdu
Einige Informationen werden in englischer Sprache angezeigt.
Über mich
I provide cost estimation and Quantity take-off Services for all types of construction, residential and commercial Projects. I am claiming 97 percent work accuracy and have a strong emphasis on work to be delivered on time. Please, let me know if there is any procedure to work with you, or do send me the drawings/plans (PDF Files/Dropbox link)whenever you have them for estimation and we will provide you the service proposal according to your project. I do all trades, Looking forward to hearing from you soon, Shahroz Tahir ... Mehr lesen

Kompetenzen

s
shahroztahir
Shahroz Tahir
offline • 

Meine Dienstleistungen

Elektrotechnik
I will detail electrical takeoff and estimate in 24 hours
Sanitär & Entwässerung
I will detail plumbing takeoff and estimate in 24 hours

Portfolio

Arbeitserfahrung

Bolt

Estimation Engineer

Bolt

Jan 2022 - Present4 yrs 4 mos

US Construction Estimator | CSI Divisions 03-33 | Takeoffs & Pricing Expert Profile Overview / Bio: I help US-based General Contractors, Subcontractors, and Developers win more bids with accurate, fast, and detailed construction estimates. With hands-on experience across all major CSI divisions, I deliver takeoffs and pricing that you can confidently submit to owners and clients. What I do: Quantity Takeoffs (Material & Labor) from PDF drawings, blueprints, and specs Cost Estimation & Pricing using current US market rates (RSMeans, supplier quotes, zip-code-based pricing) Bid Preparation with detailed breakdowns ready for client submission Budget Estimates for pre-construction and conceptual phases CSI Divisions I cover: Division 03 – Concrete (footings, slabs, walls, rebar) Division 04 – Masonry (CMU, brick veneer, stone) Division 05 – Metals (structural steel, miscellaneous metals) Division 06 – Wood & Plastics (rough/finish carpentry, millwork) Division 09 – Finishes (drywall, paint, flooring, ceilings, tile) Division 21-23 – Fire Protection, Plumbing, HVAC Division 26 – Electrical Division 31-33 – Earthwork, Exterior Improvements, Utilities Why work with me: Fast turnaround (24-72 hours for most projects) Clear, organized Excel deliverables with summary + line items Familiar with US codes, units, and bidding practices Transparent communication and unlimited revisions until you're satisfied Let's discuss your project — send the plans and I'll get back with a quote within hours.

1 Bewertungen
5,0

(1)
(0)
(0)
(0)
(0)
Zusammensetzung der Bewertung
  • Kommunikation
    5
  • Qualität der Lieferung
    5
  • Preis-Leistungs-Verhältnis der Lieferung
    5
1–1 von 1 Bewertungen
Sortieren nach:
Am relevantesten
    J

    joeward720

    US

    Vereinigte Staaten

    5

    An exceptional, accurate, and quick moving project delivered flawlessly! I’ll use him again and again.

    Bis zu 50 $

    Preis

    1 Tag

    Dauer

    Hilfreich?
    Ja
    Nein